High Quality Steel Fabricators in the UK

Phone Number: 01206 632232

Office Number: 01206 822711

Do I Need Planning Permission for a Steel Building

  • Posted by:
  • Admin
  • Tags:
  • steel buildings, metal fabrication, planning permission, steel building installation guide
  • Posted date:

Planning permission for a steel building depends on several key factors such as the building’s size, location, and intended use. Some steel buildings fall under the Permitted Development Rights, especially in agricultural or rural settings. Agricultural buildings, such as farms, that are under 465 square metres don't need planning permission as long as they comply with specific height restrictions and distance regulations. If the building is being...

Posted by: Admin on: Read More

How Long Does It Take to Install a Steel Building

  • Posted by:
  • Admin
  • Tags:
  • metal fabrication, steel buildings, metalwork installation, steel building installation guide
  • Posted date:

The time it takes to install a steel building can vary depending on the size, design, and intended use of the structure. On average, installing a standard steel building can take anywhere from a few days to several months. For small steel buildings, like single-car garages, storage sheds, or small workshops, the installation process typically takes 1 to 2 weeks once the site is prepared and the foundation is in place. These structures are often...

Posted by: Admin on: Read More